Factory & Production

Manufacturing visibility buyers can trust

Factory overview, capacity, process, equipment and Quality Control—all in one focused page.

Factory Overview

Built around repeatable production

Our factory presentation brings the facility, production lines, equipment, inspection system and export preparation into one clear manufacturing story.

Draft research recordCapacity and timing figures are working references. Replace them with verified factory information before public launch.

Production Capacity

Planning figures for buyer conversations

“Finished sets per day” means complete sets that have been counted, inspected and packed—not loose tile output.

500

Finished sets / day

Draft planning estimate

12,000

Finished sets / month

Based on 24 working days

10–15

Sample working days

After artwork approval

30–45

Production days

Standard order estimate

3

Production lines

Research placeholder

300

Sets minimum order

Research placeholder

Production Process

From approved material to packed set

A controlled sequence protects artwork quality, set completeness and delivery consistency.

01

Material preparation

Approved tile material, color and dimensions are prepared against the product specification.

02

Tile forming

Rectangular blanks are formed and stabilized for consistent dimensions.

03

Surface finishing

Edges and faces are polished and cleaned before decoration.

04

Engraving or printing

Approved artwork is transferred using the selected production method.

05

Color application

Solid colors are applied and checked for gaps and overflow.

06

Tile inspection

Dimensions, artwork registration, finish and color are checked by batch.

07

Set sorting

Every suit, Wind, Dragon, Flower and Joker is counted.

08

Packing and release

Accessories and packaging are assembled before final inspection.

Machinery & Equipment

Equipment to document

  • 01Material preparation and tile-forming equipment
  • 02Cutting, edge finishing and polishing equipment
  • 03Computer Numerical Control engraving machines
  • 04Ultraviolet flatbed printing equipment
  • 05Color-filling, curing and cleaning stations
  • 06Inspection, counting and packing stations

Quality Control

Checked throughout production—not only at the end

Recommended checkpoints for American Mahjong production.

01

Incoming material and surface inspection

02

First-article approval

03

Tile dimension measurement

04

Engraving or print-registration check

05

Color and surface-cleanliness check

06

Complete 152-tile count verification

07

Packaging and carton inspection

08

Final random inspection and release

Quality inspector measuring the width of a custom American Mahjong tile

Discuss Your Order

Need factory data for your sourcing review?

Request Factory Information